Day 2 – Etec Practical Course
This morning we started with a 3 phase induction motor. The first thing was to identify the terminals by measuring the resistance and labeling the wires. 294 Ohms was the winding resistance. We then wired it in star configuration was meant linking V2, U2, W2 together. Star provides lower voltage which means lower start current.… Read More »